Important Notice: Tekoa Website is currently undergoing maintenance. Some pages may not load correctly at this time.

We apologize for the inconvenience, however we will be back up soon!

Ethekwini - Point

800mmDiameter Pipeline across Durban CBD

Contact person

Mrs Nasreen Arabi

Role

Project Supervisor

Contact details

031 311 4733

Email

Nasreen.Arabi@durban.gov.za

Contact person

Ethekwini Metro Municipality

Study Period

October 2019 – In-progress

Consultant Team

- Nako Illiso Consulting Engineers (Main)
- Tekoa Consulting Engineers (Sub)

Key Deliverables

  • 4150m of DN800 steel water main
  • All associated valves within a water pipeline including chamber structures.
  • All remedial works to paved road surfaces necessitated by the installation of the DN 800 water main.
  • All works relating to connecting the new water main to the existing primarily Asbestos Cement (AC) reticulation, including closure/removal of valves identified in the reticulation.
  • Refurbishing of the paving area running along the pipeline route (20 000m²).

About the Project

The project entailed design and construction monitoring of a DN800 Steel Water main along Anton Lembede Street from Alexander Street (CH 0 000) to Mahatma Gandhi Road (CH 2250) and along Mahatma Gandhi Road from Anton Lembede Street (CH 2 250) to Camperdown Road (CH 4 150). The purpose of the project is one of the critical services that are currently being upgraded to meet the near-future development demands which shall see the new Point precinct developing in amulti-billion dollar economy of eThekwini Metro Municipality, in line with the city’s integrated development plan. 

Our Role

The assignment included:

  • Contract Administration, and inspection
  • On-Sitere-design
  • On-site Quality Control, and
  • Closeout